Skip to content

Wardrobes · Quotation guide

Wardrobe Cost in Brunei

Last updated:

A useful quotation comparison starts by checking whether both quotations describe the same wardrobe.

Dimensions, fronts, internal storage, hardware, fittings and site scope all affect a wardrobe quotation. Use this guide to decide what belongs in the written specification before comparing wardrobe prices in Brunei.

Start with the scope

Why two wardrobe quotations can differ

Similar fronts can conceal very different storage. One quotation might describe a shelf-and-hanging layout; another might include drawer banks, organizers or a desk. A lower quotation may simply contain less scope.

Measured dimensions and cabinet sections
The overall width, height and depth, and the number and configuration of sections, determine how much cabinetry is being specified. Compare the same measured run.
Fronts, finish and hardware
Hinged and sliding fronts use different hardware arrangements. The selected front construction, finish, profile and door system should be named rather than left to assumptions.
Storage, features and fitting
Shelves, drawers, hanging arrangements and accessories change the work inside. Special niches, integrated desks and the agreed delivery and fitting scope also belong in the comparison.

The room and configuration change the scope

Compare the wardrobe that fits your room and storage priorities. House type or neighbourhood does not establish its layout, and a configuration name alone does not describe everything included.

A full-height fitted wardrobe or a smaller run
Confirm the actual extent of the cabinetry, including any upper storage, end panels or returns. A shorter run and a full-height wall should not be compared as the same scope.
Hinged or sliding fronts
A hinged wardrobe quotation should describe the doors and hinges. A sliding wardrobe quotation should identify the selected sliding system. Plan door movement around the bed, room doors and nearby furniture; clearance depends on the actual room and chosen system.
A Walk-In room
A Walk-In wardrobe quotation needs a room-specific layout and an agreed list of cabinetry and fittings. Drawers, shoe storage, lighting or an island are choices to specify, rather than automatic inclusions. See the Walk-In wardrobe planning guide.
Desk-integrated or niche storage
Identify the desk, display niche or open shelving separately so its extent, finish and fittings can be compared with the same features in another quotation.

What should the written specification say?

Ask for the selected details, including any exceptions.

  1. The carcass

    Caramella's standard carcass material is ENF plywood unless another material is agreed. PUR adhesive is used for edge sealing.

    The quotation should identify the selected carcass material, relevant finish, edge treatment and any project-specific exceptions.

  2. Doors and fronts

    Record the hinged or sliding arrangement, selected finish, substrate where relevant, profile and selected hardware or system.

    Where Shaker fronts are selected, the specification is HMR MDF, CNC from China. Shaker is a selected front option; it is not the specification for every wardrobe.

  3. Hardware and accessories

    For hinged cabinetry, Blum CLIP top is the primary hinge line; DTC is an alternative hinge line. For sliding doors, the selected mechanism or system is project-specific and should be identified in the quotation.

    For drawers and accessories, identify the selected runner or accessory model and quantity where relevant. Additional drawers, organizers and fittings change the project scope.

  4. Internal organization

    Agree how hanging, shelves and drawers are distributed between sections. Luggage, shoes, accessories and occasional-use items can require different storage arrangements and fittings.

    Compare the actual internal layout. A wardrobe with mostly hanging space is a different specification from one with many drawers and organizers, even when the outside looks similar.

  5. Special features

    An integrated desk, display niche or open shelving should have its own agreed scope. Lighting is a project-specific feature only when separately specified; it is not automatically included.

    Electrical work remains outside normal cabinetry scope unless separately agreed. Confirm responsibility for any required work before the cabinetry is fitted.

Keep both quotations beside you

Compare the same wardrobe, line by line

Mark each item as included, excluded or needing clarification in both quotations. Resolve missing details before deciding whether the two totals describe comparable work.

Measured size and configuration
Do both describe the same width, height, depth, cabinet sections and hinged or sliding arrangement?
Carcass and front specification
Are the carcass material, finish and edge treatment named? Are the front finish, substrate where relevant and profile clear?
Hinges, sliding system and accessories
Are the selected hinge line or sliding mechanism and the drawer-runner and accessory models identified? Are the relevant quantities stated?
Internal layout
Do the drawings or descriptions show the same hanging arrangements, shelves, drawers and storage fittings?
Desk, niche, open shelving and lighting
Is each special feature explicitly included or excluded, with its extent and selected finish or fittings recorded?
Delivery, fitting and room preparation
What delivery and fitting work is included? Who is responsible for any structural changes, electrical work or other room preparation?
Production drawings and sign-off
What information must be confirmed, and when do you approve the production drawings? Is the stated timing clearly limited to production?
Warranty terms
What does the written warranty cover? Compare the stated coverage rather than assuming that every material, finish or accessory has the same terms.

Confirm the boundaries before proceeding

Clear scope, timing and warranty wording help you understand what the quotation commits to and which work needs a separate agreement.

Cabinetry scope
Caramella's normal scope is cabinetry unless separately agreed. Structural changes, electrical relocation or work, and other room-preparation work are outside that normal scope. Confirm the delivery and fitting scope in writing. For coverage, see service areas.
Production timing
Production lead time is typically 10–14 weeks from confirmation and customer sign-off of the production drawings. This is production timing, not a whole-project completion guarantee.
Structural warranty
Caramella provides a 1-year structural warranty. Confirm the written terms; this statement does not extend the structural warranty to finishes, hardware, moisture damage, mould or accessories.

From quotation scope to room planning

This page explains what changes a wardrobe quotation. For room planning, wardrobe types and completed Caramella work, see Built-In Wardrobes in Brunei.

Walk-In planning
Walk-In projects have room-specific planning considerations. Use the Walk-In wardrobe guide to consider the room before confirming the cabinetry and fittings.
Caramella's quotation approach
For the broader approach to confirmed scope and written quotations across Caramella projects, see how quotations are prepared.

Prepare a clearer enquiry

Share the room and the storage you need

Where available, send room dimensions, room photos, your door or front preference, storage priorities and any desk or niche requirements.

These details improve quotation accuracy. The final quotation depends on confirmed project information.